Replacing Superior gym floor

New gym floor at SHS

 

March 25, 2021

A worker from JWood Sports Flooring, Hudson, Wis., loads parts of the anchoring system for the new gymnasium floor installed at Superior High School. The floor is expected to be ready for use in time for graduation.

The Superior High School gymnasium is having a new floor installed. Several years ago, a water pipe in the utilities room adjacent to the gymnasium broke in the middle of the night. The leak was discovered by a Superior police officer on routine patrol but the damage had been done. Water had infiltrated under the floor in the bleacher area as well as the performance area. The decision was made to resurface the floor. The original Wildcat logo in the center of the court was replaced.

Fast forward six years. The affected area of flooring was warping and buckling. Because of several refinis...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024